This house is planned as a classic old-style
Jerusalem house, and will be finished using the highest quality materials,
covered and ornamented with typical style stone features.
Each of the apartments has a private parking space and a
separate entrance.
The Garden Apartment (total
of 304 square meters/ m2) consists of three floors: The
entrance floor (117 m2) has an extra large
dining room, kitchen, living room
and extra high ceiling (3 m).
The upper floor (70 m2)
has an extra large master bedroom, two large bedrooms en-suite, and family
room. The garden level (117 m2
of this unit consists of four more bedrooms.
The Penthouse Apartment (3042)
consists of three floors: An entrance floor (124 m2)
with an extra large dining room, kitchen, living room, large Succah porch,
extra high ceiling (3 m),
and a spectacular view. The bedroom
floor below the entrance floor (99
m2 consists of an extra large
guest master bedroom, two large bedrooms en-suite, and a family room. The floor
above the entrance floor is a 61-m2-dream suite with an extra large
bedroom and a breathtaking panoramic view, extra large walk-in closet, large
bathroom and a study. This suite is surrounded with a spacious and landscaped
porch (38 m2 )This apartment also comes with a separate
little 20-m2-guest apartment on the garden
level. The access to the penthouse
apartment is through a private staircase and private elevator.
The technical specification includes
private central air-conditioning, under-tile heating system, high-quality
marble flooring, solid wood extra-tall doors, Shabbat elevator, alarm system,
as well as other very high-quality finishing features. The apartments are equipped with high-quality
electric appliances: Maytag washer and dryer, side-by-side extra-large GE
refrigerator, two built-in ovens, and two dishwashers.
The house, both exterior and interior, is designed by the
architect David Cherki, one of the finest architects in Jerusalem, and will be
built by an experienced contractor specializing in extra-high-quality
construction and finish.
The construction is scheduled to be completed by December 2006.